Todd Engineering delivered a comprehensive turnkey installation for Gemini Taunton, a long-standing customer. A temporary booth was installed to maintain full operational continuity while the new Zeus all-electric system was commissioned — demonstrating Todd Engineering's commitment to zero-downtime delivery.
The installation centred on a Zeus All-Electric Spray Booth with far infrared curing technology, side-loading roller shutter door and all-electric operation aligned with carbon-neutral goals. A Track & Skate System enables seamless vehicle movement from preparation through to the refinishing stage, significantly improving workflow. A dedicated Paint Mixing Room is positioned adjacent to the spray booth for optimal efficiency. A temporary Olympian Booth was installed during the transition period to maintain zero operational downtime throughout the project.
The extensive project at Gemini Taunton began with the careful dismantling of their existing Todd Engineering spray booth, a critical step requiring precision and efficiency to ensure minimal operational downtime. Recognising the importance of uninterrupted service for Gemini, we strategically installed a temporary Olympian spray booth. This interim solution allowed Gemini Taunton to maintain continuous workflow, ensuring business as usual during the transitional phase.
With the temporary facility fully operational, our dedicated team moved forward with the installation of the advanced, eco-friendly Zeus all-electric spray booth. This innovative booth features:
Side-loading Roller Shutter Door — Enhancing operational flexibility and vehicle accessibility.
Track and Skate System — Providing seamless vehicle movement from preparation to the refinishing stages, significantly improving workflow and productivity.
Dedicated Paint Mixing Room — Positioned strategically adjacent to the spray booth for optimal workflow and efficiency, reducing downtime and enhancing the speed and quality of the refinishing process.
In alignment with the growing industry shift toward carbon neutrality, Gemini Taunton has taken a decisive step by adopting the Zeus all-electric spray booth. This forward-thinking choice supports their mission to reduce carbon emissions and improve energy efficiency, with the ultimate aim of reaching net-zero operations in the future. The Zeus booth uses far infrared (FIR) technology to cure paint at a molecular level, dramatically lowering energy consumption and eliminating the need for fossil fuels in the refinishing process.
This successful collaboration with Gemini Taunton underscores Todd Engineering's unwavering commitment to providing tailored, efficient, and sustainable solutions. Our comprehensive approach — from initial consultation, planning, and installation to commissioning and post-installation support — ensures our clients receive the highest standard of service and support at every stage. We extend our sincere gratitude to Gemini Taunton for their continued partnership and trust, and we look forward to supporting their future growth and success.







Everything went and was fine yesterday, thank you. I would like to commend every one of you involved in the installation of our new oven. From your good self to the guys who have been working so hard to complete the install. Please pass on my thanks!
Stuart, General Manager, Gemini Taunton