UK Offshore Wind Farm — Seah Wind

ClientSeah Wind
Project Duration18 Months
Booth TypeBespoke Large-Format
18 Months
Project Duration
Bespoke Large-Format
Booth Type
Renewable Energy
Sector
Turnkey
Delivery

The Brief

The project required a purpose-built finishing facility capable of accommodating large-format wind turbine components — a scale and specification far beyond standard automotive or industrial spraybooth installations. Environmental performance, coating quality and operational throughput were all critical requirements.

The Solution

Todd Engineering engineered a bespoke large-format finishing environment with custom airflow, heating and filtration systems designed specifically for the dimensions and coating requirements of offshore wind components. The entire project was delivered as a turnkey installation over an 18-month programme, with our team managing all aspects of design, manufacture, installation and commissioning.

Seah Wind required specialist surface finishing and coating facilities capable of handling the enormous scale and specific technical requirements of offshore wind turbine components. Todd Engineering designed, manufactured and installed bespoke facilities across an 18-month programme — the most complex and large-scale deployment in the company's history.

Todd Engineering delivered the complete installation on time and within programme — contributing directly to the successful commissioning of the UK's largest offshore wind farm. The facilities continue to operate at the specification designed, providing Seah Wind with the surface finishing capability required for full production.

The Todd Engineering team delivered a genuinely bespoke solution — engineered to our exact specification and delivered on time.

Seah Wind, Renewable Energy