Automotive

MG Accident Repair Centre — Zeus Upgrade

ClientMG Accident Repair Centre
SectorAutomotive
DateJuly 2024
Automotive
Sector
July 2024
Date
50% productivity increase
Result
Carbon-Neutral Upgrade
Type

The Brief

MG Accident Repair Centre, a long-standing Todd Engineering customer, upgraded from their existing Spartan booth to the Zeus all-electric system — driven by carbon-neutral goals, PAS 2060 compliance ambitions and the desire to reclaim space previously occupied by a gas bulk tank. The results exceeded expectations across every metric.

The Solution

Todd Engineering installed the Zeus All-Electric Spray Booth adjacent to the existing Spartan booth following successful operational trials. Elimination of the gas bulk tank reclaimed significant floor space and removed ongoing fuel supply costs. All-electric operation directly supports MG's carbon-neutral certification journey toward PAS 2060 compliance. Far infrared technology delivers faster cycle times — with a 50% increase in productivity reported following the transition to the Zeus system.

MG Accident Repair Centre, a long-standing Todd Engineering customer, upgraded from their existing Spartan booth to the Zeus all-electric system — driven by carbon-neutral goals and the desire to eliminate gas costs from their operation.

The upgrade delivered an immediate reduction in energy costs while improving throughput and finish quality. The transition from Spartan to Zeus was managed by Todd Engineering with minimal disruption to the bodyshop's day-to-day operations.

Enquire

Start your project